Installing Geodome Watershed Insulation Umbrella
At least a foot of fill was pushed by the bulldozer over the umbrella to spread out the load of the machinery so that the umbrella would not be damaged.
Start Tour
|
Precasting
|
Forms Details
|
Site Prep
|
Assembly
|
Joining Sections
|
Assembling Scoop
|
Waterproofing
|
Backfilling
Copyright © 2003, 2007 The Rocky Mountain Research Center
P O Box 2470
Chino Valley, Arizona 86323
USA
info@earthshelters.com
Webmaster:
webmaster_everrun@postmaster.co.uk
Everrun Software Solutions
The structure was carefully backfilled. Then the Insulation watershed umbrella was added.
The umbrella covered both the dome and the garage.